Starting a denim brand means building a small, repeatable production run before you build an audience: 3 to 5 styles, 300 pcs each, one factory that can cut, sew and wash. The two numbers that decide year one are your landed cost per pair and the cash gap between the deposit you pay and the reorder you fund.
Budget USD 16,000–34,000 for a 900–1,500 pc first run, and plan 10–14 weeks from approved tech pack to goods at your door.
What a first collection costs, line by line
A 12 oz rigid straight jean at 300 pcs sits in a typical FOB range of USD 12–19 per piece before freight and duty. That range moves on wash time more than on fabric: the same jean in a rinse and in a heavy destroy can differ by USD 4.00 a pair on the factory floor.
- Sampling: USD 80–150 per style, credited against bulk above 1,000 pcs. Three styles, one round each: USD 240–450.
- Fabric: 1.4–1.6 m per pair at 12 oz, USD 3.20–5.80 per meter, so USD 4.48–9.28 of cloth per jean.
- Wash: rinse USD 1.20–2.00 per piece, stone or enzyme USD 2.10–3.20, heavy destroy USD 4.50–6.50.
- Labels and trims: USD 0.60–1.40 per piece for woven label, leather patch, hangtag and polybag, plus USD 150–400 per trim for a custom die.
- Freight: sea USD 0.80–1.60 per pair in 30–38 days, air USD 4–7 per pair in 5–8 days.
- Content: USD 1,200–3,000 for 8–12 looks, and buyers who skip it usually pay for it twice.
Add 12% for duty into the US or 12% VAT plus 2–4% duty into the EU, and a first 900-pc run lands at roughly USD 18,000–30,000 all in.
Three to five styles is the right first collection
MOQ is 300 pcs per style per color, so five styles in two colors is 3,000 pcs — a first-order mistake, not a launch. The workable shape is 3–5 styles, one color each, 900–1,500 pcs total, with about 60% of the buy in your two strongest fits.
Depth beats breadth for a second reason. A size curve of 28–36 waist at 12 pcs per size uses 108 pcs per style, which leaves 192 pcs for a second colorway without touching the minimum. Brands that spread 300 pcs across six colors end up with 50 pcs a color, 4 pcs a size, and no size left to reorder.
Stock blocks versus custom patterns
A stock block — our proven straight, slim or wide-leg pattern — costs nothing to sample and ships in 7–10 working days. A custom pattern needs a fit round, a graded measurement chart and 10–14 days when a new wash is developed alongside it.
The trade is arithmetic. Pattern work and grading add roughly USD 600–1,200 once; across 300 pcs that is USD 2.00–4.00 a pair, across 3,000 pcs it is USD 0.20–0.40. Launch private label on a stock block, then move to a custom pattern when a style passes 1,000 pcs and you know the fit sells. We keep the block on file either way, so a reorder skips development entirely.
Where the money should go first
When the budget is tight, the order of spending matters more than the total. Two extra washes on a proven fit sell; two extra styles in a wash nobody asked for do not.
- Spend on fit: one measurement round and a proper size curve. A 1 cm error across 28–36 waist is the cheapest thing to fix and the most expensive to ignore.
- Spend on the wash: a USD 3.20 enzyme wash against a USD 1.60 rinse is USD 1.60 a pair, which on 900 pcs is USD 1,440 — usually the difference between a jean that photographs like the reference and one that does not.
- Save on trims and packaging: stock shank buttons, a woven label without a custom die and a plain polybag keep USD 0.60–0.90 per piece in your pocket until a style repeats.
The one line never to cut is inspection. AQL 2.5 on 900 pcs samples 80 garments and adds nothing to the invoice; a 3% defect rate on the same order is 27 unsellable pairs and a chargeback conversation with your retailer.
Cash flow: the 90-day gap
Production runs on 30% deposit and 70% against the bill of lading. On a USD 18,000 order you wire USD 5,400 to start, USD 12,600 about 6 weeks later, and the goods arrive 4–5 weeks after that by sea. Your cash is out for 60–90 days before the first pair sells, and the 70% balance leaves before the goods do.
Plan the reorder before the first delivery lands. A style that sells 35–45% at full price in 60 days is a reorder; waiting for 80% sell-through means a 25–35 day production queue plus 30 days of ocean freight, and you are out of stock for two months. Hold back 20% of your launch budget for that reorder instead of spending it on a sixth style.
Costing a jean from the inside out
Most first-time cost sheets stop at FOB and then break on the second line. Build four lines instead.
Cloth and consumption
Denim is sold by weight, not length: 12 oz at 1.5 m per pair is about 0.92 kg of purchased cloth. A 14.5 oz cloth cuts 1.11 kg into the same jean and adds USD 0.90–1.40 at the same meter price. Marker nesting matters as much — 87% utilization versus 80% on a 900-pc run is USD 500–700 of wasted fabric.
Wash time and hand-feel
Wash is priced by drum minutes, not by effect. A rinse is 40–60 minutes; a stone with enzyme and softener is 90–120; a hand-sanded destroy with bleach and neutralization runs 180–240 and adds a second handling pass. That is why two factories quote the same reference photo USD 3 apart.
Duty, freight and returns
Duty is charged on the FOB value, so a USD 15 jean at 12% is USD 1.80 before freight. Returns matter more than duty: a 1 cm waist variance across a size run pushes return rates from 8% to 18%, and each return costs you outbound and inbound freight. A 100% measurement check on the first 50 pcs is cheaper than that.
Work the sheet backwards from the price you need. If a pair has to wholesale at USD 48 to sit in your range, landed cost must stay under USD 21, which puts FOB at USD 15 or less once freight and duty are counted. That reverse calculation rules out heavy destroys and imported selvedge faster than any budget review.
Launch timeline, week by week
The calendar below assumes a stock block, one custom wash and a 1,200-pc order.
- Week 0: brief, fabric selection, quote. 2–3 days.
- Weeks 1–2: counter-sample in your fabric, 7–10 working days, plus 3–5 days transit to you.
- Week 3: wash standard approved on a full garment, 5–7 days after lab dips.
- Week 4: pre-production sample signed, deposit wired, fabric booked.
- Weeks 5–9: bulk cutting, sewing and washing, 25–35 days.
- Week 10: AQL 2.5 inspection and packing, 3–5 days.
- Weeks 11–16: sea freight 30–38 days, or 5–8 days by air if you are launching on a fixed date.
Two buffers protect that calendar. Trims arrive in week 2 or they delay week 5 — a 10-day label lead is the most common reason a bulk start slips. And a 5-day inspection window before booking freight stops you paying for a container that sails without your order.
Three mistakes that cost first-time brands money
Approving a wash from a photo. A screen cannot show hand-feel or the 20–30% shade drift between a lab dip and a production drum. Approve on a garment, in daylight, and keep the approved piece as the standard for every reorder.
Buying one colorway too deep. Two colors at 300 pcs each is 600 pcs of one style; if the fit misses, you own 600 pairs. One color, three styles, 900 pcs tests three fits for the same money.
Ordering labels and patches after the fabric. Woven labels, shank dies and leather patches carry 10–20 day lead times of their own. Approve trims in week 2, not week 6, or the bulk order waits on a USD 300 label.
Next step
Send your style references, target price and launch date through our contact page, and you will get a costed counter-proposal with fabric options, wash tiers and a dated production slot within 2 working days. If you have no tech pack yet, send three photos and a target FOB range and we will build the spec sheet with you.