Skip to content

Ten Questions Buyers Ask Before Placing a Denim Order

Ten answers on minimums, sampling, bulk timing, payment, shipping and QC: 300 pcs per style per color and 25–35 days after sample approval.

Denim style from our production range

These are the questions that come up in the first call, answered with the numbers we quote in writing. If your question is not here, send it with your tech pack and it will be answered in the same reply, usually within 12 working hours.

The short version: 300 pcs per style per color, 7–10 working days for a sample, 25–35 days for bulk after the pre-production sample is signed, and AQL 2.5 on the final inspection. Everything below is the detail behind those four numbers.

  • MOQ 300 pcs per style per color, any size mix within a color
  • Sampling 7–10 working days, 10–14 when a new wash is developed
  • Bulk 25–35 days after PP approval, FOB Guangzhou as standard
  • AQL 2.5 final inspection plus an in-line check every 50 pcs
Ask a different question

Ordering, payment and shipping

An order starts with a tech pack, a sample garment or a measurement chart, not with a purchase order. We review it, confirm what is achievable on our lines, and return a costed quote with a wash recommendation and a sample date. Nothing is cut until you approve the counter-sample and pay the deposit.

Payment is 30% on order confirmation and 70% against the bill of lading, or a letter of credit for orders above 5,000 pcs. FOB Guangzhou is the standard term; CIF and DDP are quoted on request, and we handle the export documents, the commercial invoice and the packing list. Production slots are held for 7 days from the quotation date, then released to the next buyer.

What goes in the quote

  • Fabric, weight and mill, with the shade band stated per lot.
  • Wash recipe and the laundry time it consumes.
  • Hardware, labels and packaging, itemized rather than bundled.
  • Sample fee, bulk unit price, and the ship window after PP approval.

Shipping that suits a first order

Small orders usually move by air or LCL sea freight; a 1,200 pc order fills about two cartons per 100 pcs and rarely justifies a full container. We book against your forwarder or ours, send the packing list 3 days before dispatch, and photograph the pallet before it leaves the loading bay.

Sampling, bulk and quality control

The sample is where an order is won or lost. We sew one counter-sample per style in your fabric, measure it against the chart, and send it with a wash swatch so you can approve shade and hand-feel separately. If a new wash is involved, allow 10–14 working days instead of 7–10, because the lab dips run in parallel with the sewing.

Bulk starts only after you sign the pre-production sample. Cutting runs on an 8-layer lay with a printed marker per size, sewing runs in cells of 24 operators with an in-line check every 50 pcs, and the laundry washes 300–600 pcs per drum batch against the approved standard. Final inspection is AQL 2.5, plus a 100% measurement check on the first 50 pcs of every run.

What we inspect

  • Measurement against the signed chart, with tolerances stated per point.
  • Shade against the approved swatch under D65 light, checked per drum.
  • Stitch density, seam strength, hardware pull and metal detection.
  • Packing, size stickers, carton marks and carton drop test.

When something goes wrong

We answer claims with photographs and a decision within 5 working days: re-make, credit or a price adjustment on the next order. A third-party inspection is welcome at any stage, and we will book the slot and provide the sampling plan so the audit is not delayed.

If your question is not on this page, send it with your tech pack to our merchandising team and it will be answered in the same reply as the quote.

Frequently asked questions
What is your minimum order quantity?

300 pcs per style per color. A two-style, two-color launch therefore starts at 1,200 pcs; a single style in one color starts at 300. Sizes can be mixed freely inside a color, with a 12 pc minimum per size so the cutting marker stays efficient.

How long does a sample take?

7–10 working days from an approved tech pack and confirmed fabric. If the sample needs a new wash developed from your swatch, allow 10–14 working days, because three lab dips are run and compared before the garment is washed and sent.

Do you charge for samples?

Yes, per style, at a fee that covers fabric, sewing and laundry time. The fee is credited against bulk orders above 1,000 pcs. A sample with a new wash costs more than a stock recipe because it occupies a drum for a test batch of one.

What are your payment terms?

30% deposit on order confirmation and 70% against the bill of lading. Larger orders can run on a letter of credit by arrangement. We invoice in USD, and the deposit is only taken after you approve the PP sample and the wash standard.

Which shipping terms do you offer?

FOB Guangzhou as standard, with CIF and DDP quoted on request. Small orders ship by air or LCL; a 1,200 pc order is roughly 24 cartons. We send the packing list 3 days before dispatch and can book against your forwarder if you have one.

How long is bulk production?

25–35 days after pre-production sample approval, depending on wash complexity and the number of colourways. A 12 oz rigid jean with a rinse wash sits at the fast end; a 13.5 oz jean with hand sanding and resin sits at 35 days or slightly beyond.

How do you control quality during production?

In-line checks every 50 pcs, a 100% measurement check on the first 50 pcs, and AQL 2.5 on the final inspection. Every garment passes metal detection before packing, and shade is checked against the approved standard once per drum batch.

Can we appoint our own inspection company?

Yes, and we recommend it for a first order above 2,000 pcs. SGS, BV and Intertek all inspect here regularly. Send the booking date and the sampling plan 5 working days ahead so we can hold the finished goods and have the cartons ready.

What happens if goods arrive with defects?

Send photographs and the carton numbers. We compare them against the inspection report and answer within 5 working days with a re-make, a credit or an adjustment on the next order. Claims raised after 30 days are handled case by case, since the cause is harder to establish.

Can we change the wash or label on a reorder?

Yes. A wash or label change on an approved pattern skips pattern development, so it adds 10–14 days for a new wash and none for a label swap. The block, grade rule and measurement chart stay on file, which is why reorders run 25–35 days.

Tell us what you want to make

Share the style, target quantity and launch date. You get fabric options, wash recommendations, a sampling date and a factory-direct quote — usually within 12 working hours.

Need a quick answer?

Message our merchandising team on WhatsApp — we reply within 12 working hours.

WhatsApp +86 138 0000 0000