Skip to content

What Our Denim Factory Does, Department by Department

Denim factory capabilities in Xintang: design and R&D, fabric sourcing, 6 sewing lines, a 4-line wash house and AQL 2.5 quality control on site.

Denim style from our production range

Five departments sit inside 12,000 m² in Xintang: design and development, fabric sourcing, manufacturing, the wash house, and quality and delivery. Each one has its own page here, with the numbers that decide cost, lead time and whether a fit survives production.

180 staff, 6 sewing lines and 4 wash lines produce 80,000 pcs a month for 300+ denim brands across 40 export markets. Nothing is subcontracted, so a change in one department is visible to the next on the same day rather than at the end of a shipment.

Plan a factory visit

How the five departments connect

A style moves through all five in sequence, and each handover carries a document: a graded chart from design, a roll inspection from sourcing, a bundle routing from manufacturing, a drum card from the wash house and an AQL 2.5 report from quality. That paper trail is what makes a repeat order match its first shipment.

The chain also sets the calendar. Sampling takes 7–10 working days, bulk runs 25–35 days after the pre-production sample is signed, and a new wash adds 3–5 days at the front. Book the wash standard before the line is booked and the dates hold. If a date slips, the reason arrives with a new date rather than an apology.

  • Design and R&D: patterns, fits and 3D sampling.
  • Sourcing: 9–14.5 oz denim, shade and shrinkage.
  • Manufacturing: 6 lines, 45–60 pcs per operator per day.
  • Wash and quality: 4 lines, AQL 2.5 before packing.
Frequently asked questions
Can we visit the factory before ordering?

Yes. Buyers are welcome in Xintang, and we arrange a line walk, a wash house tour and a sample room review in one morning. Tell us a week ahead and we will have your reference garments, swatches and measurement charts ready for the visit.

Which department handles a new style first?

Design and development. A new style starts with a block from the 40-fit library, is digitized and graded from 28 to 46 waist, then moves to sourcing for a fabric booking before manufacturing sees a single bundle. That order is fixed.

Is every capability really in one building?

Yes, cutting, sewing, washing, finishing and packing all sit inside 12,000 m². That is why a shade correction takes a day instead of a shipping cycle, and why the wash house can re-run a drum in the same week a fault is found.

How much capacity is free for a new brand?

We hold slots for new programs every month inside the 80,000 pc capacity. A first order of 300–1,200 pcs usually starts within 3 weeks of sample approval, depending on the drum queue and the fabric lead time. Rush slots are quoted separately, with the extra cost stated up front.

What certifications can you support?

OEKO-TEX Standard 100 yarns, GRS-certified recycled cotton, a BSCI-audited sewing unit, an ISO 9001 quality system and ZDHC-aligned wash chemistry. Certificates are available on request, and we send the current copies straight into your compliance file. Audit dates for BSCI and ISO are shared on request as well.

Tell us what you want to make

Share the style, target quantity and launch date. You get fabric options, wash recommendations, a sampling date and a factory-direct quote — usually within 12 working hours.

Need a quick answer?

Message our merchandising team on WhatsApp — we reply within 12 working hours.

WhatsApp +86 138 0000 0000