Denim Manufacturing in One Building, From Cut to Carton
Denim garment manufacturing on 6 sewing lines: 180 staff, 80,000 pcs a month and 45–60 pcs per operator per day in a 12,000 m² plant.

Six sewing lines, 180 staff and 12,000 m² under one roof in Xintang. Cutting, sewing, washing, finishing and packing run in sequence inside the same building, so a 1,200 pc order never waits for a truck between departments.
Output is 80,000 pcs a month across jeans, jackets and shorts. A jeans operator sews 45–60 pcs a day on a single-piece flow; a jacket cell runs slower because a trucker jacket has 34 pieces before the hardware goes on. Capacity is quoted in line-days rather than pieces, because a 300 pc order and a 3,000 pc order compete for the same sewing stations.
- 6 sewing lines, 180 staff, 80,000 pcs per month
- 45–60 pcs per operator per day on five-pocket jeans
- 12,000 m² plant with cutting and washing in-house
- In-line quality check every 50 pcs on the line

Cutting runs on an 8-layer lay with a nested marker at 87% fabric utilization. Bundles are numbered by size and color, and the first bundle reaches the line only after the pattern is checked against the approved sample. Offcuts and rejects are counted daily, so fabric loss shows up in the cost report rather than in a year-end surprise.
Sewing is single-piece flow in cells of 24 operators, one operation per station. A bundle does not move on until the seam has been checked, which is why most defects stop at the station instead of surfacing at final inspection.
- 8-layer lay, marker nested to 87% utilization
- Cells of 24 operators, one operation per station
- Bundle tracking by size, color and line
- Re-cuts pulled from stock fabric, not re-ordered
Work that happens before and after sewing.
Jeans, jackets and shorts moving through the plant.




What decides your ship date
The sewing line, not the cutting table. Six lines running 80,000 pcs a month is about 18,000 pcs a week across jeans, jackets and shorts, and a 1,200 pc order books part of one line for roughly a week once the sample is approved. A line booked for jeans cannot switch to jackets mid-week without a changeover day, which is why mixed orders are scheduled in blocks.
Three things push a date: fabric that arrives late, a measurement change after cutting, and a wash standard approved too late to book a drum. A fourth is a label or hangtag that arrives after packing has started, which alone can hold a container for a week. We ask for all four before we confirm a slot, because a date confirmed against an unapproved wash is a date we will miss.
- Fabric in house before the line is booked.
- PP sample signed before cutting starts.
- Wash standard approved before the first drum.
- Trims and labels received two weeks before packing.
How many pieces can you produce in a month?
80,000 pcs a month across 6 sewing lines and 180 staff, shared between jeans, jackets, shorts and sets. A single style booked on one line runs about 3,000 pcs a week once cutting and sewing are in rhythm, assuming one fabric and one wash per style.
What is the daily output per operator?
45–60 pcs per operator per day on five-pocket jeans, depending on pocket details and topstitching. Jackets run at 12–18 pcs per operator per day, because a trucker jacket carries 34 separate pieces before hardware. A jacket cell is staffed with 14 operators.
Do you subcontract any operations?
No. Cutting, sewing, washing, finishing and packing all happen inside our 12,000 m² plant in Xintang. Keeping the wash in-house is the main reason a shade correction takes a day instead of a full shipping cycle. We have run it this way since 2010.
Can you take a rush order?
Bulk runs 25–35 days after the pre-production sample is signed, so a rush means buying a slot from another client's calendar. We quote a 21-day run only when the fabric is already in stock and the wash recipe exists. A rush that also needs a new wash is a rush we cannot hold.
What is the minimum production run?
300 pcs per style per color, in any mix of sizes with a 12 pc minimum per size. The same minimum applies to jackets and shorts, so a three-color capsule starts at 900 pcs in total, and sizes can be split any way above the 12 pc minimum.
Tell us what you want to make
Share the style, target quantity and launch date. You get fabric options, wash recommendations, a sampling date and a factory-direct quote — usually within 12 working hours.