Jeans Quality Control and Delivery Your Buyers Can Audit
Jeans quality control at AQL 2.5: in-line checks every 50 pcs, 100% metal detection and a 3-stage inspection before bulk ships in 25–35 days.

Quality here is three checkpoints, not one. Fabric and trims are inspected on receipt, the line is checked every 50 pcs while it runs, and an AQL 2.5 sample is pulled from the finished lot before packing.
Every garment passes a metal detector, because a needle in a waistband is a recall rather than a defect. Bulk runs 25–35 days after the pre-production sample is signed, and the inspection date is booked when production starts, not when you ask for it. The inspector who signs the lot out can be asked about that carton three months later.
- In-line check every 50 pcs, logged by line and operation
- AQL 2.5 final inspection on a random sample per lot
- 100% metal detection before packing
- 3-stage inspection: incoming, in-line, final

AQL 2.5 accepts a small number of minor defects per lot; it does not promise zero. On a 1,200 pc order the sample size and accept number are fixed by the standard, and the report lists every defect found with a photo and a measurement.
Major defects — broken stitch, wrong hardware, measurement outside tolerance — are reworked before the lot is packed. Every rework is counted against the operation that caused it, which is how the line learns where defects start. If rework moves the ship date, you hear it the same day, with the choice to ship short or move the date.
- Measurement check on the first 50 pcs off the line
- Shade band read against the standard on every drum
- Metal detection on every finished garment
- Third-party inspection by SGS, BV or Intertek welcomed
Inspection is only useful if the next stage can act on it.
From the final audit table to a sealed carton.




Write tolerances into the purchase order
Most disputes we see are not about workmanship. They are about a measurement that was never given a tolerance, a shade that was never signed, or a size chart copied from another brand. Put a number on each point of measure and the inspection becomes a pass-or-fail conversation instead of an argument.
We send a graded measurement chart, a signed shade standard and a packing list before cutting, and the final report measures against those three documents. If a lot fails, you get the defect list within 24 hours of inspection and a decision on rework, short shipment or a new date. On a repeat order we compare against the previous lot's report, so a slow drift is caught before it becomes a complaint.
- Critical, major and minor defects defined before production.
- Measurement tolerance per point, in centimeters.
- Shade standard signed on a full garment.
- Packing and carton marks agreed before packing day.
What does AQL 2.5 mean in practice?
It is the acceptance limit for the final inspection: a lot passes when the number of major defects in a random sample stays under the limit set by the standard. On a 1,200 pc order that sample size is fixed by the table, not chosen by us.
How often do you check the line?
Every 50 pcs, at every operation that carries a measurement or a visible seam. The check is logged by line and operator, so a drifting seam is corrected within 50 pcs instead of being discovered after the whole 1,200 pc lot is sewn.
Do all garments go through metal detection?
Yes, 100% of finished pieces pass a conveyor metal detector before packing. Jackets run through twice because of the hardware and the lining, and any detection stops the carton until the source is found. The detector is tested at the start and end of every shift.
Can we use our own inspection company?
Yes. SGS, BV, Intertek and buyer-nominated inspectors are welcome, and we book the slot and prepare the lot for them. We ask for 3 working days of notice so the goods are packed and the paperwork is ready. Their report and ours are compared before the carton is sealed.
What are your bulk lead times?
25–35 days after the pre-production sample is signed, with fabric in house. Sampling takes 7–10 working days, or 10–14 when a new wash is developed, and inspection adds 3–5 days before dispatch. Fabric lead time sits outside that window and is quoted separately.
Tell us what you want to make
Share the style, target quantity and launch date. You get fabric options, wash recommendations, a sampling date and a factory-direct quote — usually within 12 working hours.